State Road (S.R.) 7/U.S. 441 & Interstate Ramps, and the North Fork New River (C-12) Canal Improvements Project

Road: S.R. 7

Areas: Northeast

Project Number: 445673-1-52-01, 445673-1-52-02, 445673-1-52-03, 429576-3-52-01, 429576-3-52-02, 429576-3-52-03

Project Length: 3.5 miles

Project Limits: With limits on U.S. 441/S.R. 7 from Orange Drive to Riverland Road, and limits on the south side of the North Fork New River (C-12) Canal from U.S. 441/S.R. 7 to NW 31st Avenue/M.L.K. Jr. Avenue

Start Date: August 2025

Completion Date: Spring 2027

Contractor: General Asphalt LLC.

Estimated Construction Cost: $9,098,076

Point of Contact:

Angel Breedlove, Community Outreach Specialist, Phone: (786) 494-6211, Email: abreedlove@corradino.com, Para información y preguntas en Español, por favor llame al (954) 777-4302.

Scope of Work

  • Project improvements along the south side of the North Fork New River (C-12) Canal consist of constructing a new shared-use path to improve connectivity.
  • Installing a new crosswalk and pedestrian signal enhancements, including Rectangular Rapid Flashing Beacons (RRFBs), at NW 34th Street and the North Fork New River (C-12) Canal to enhance pedestrian safety.
  • Upgrading sidewalk curb ramps, signage, and pavement markings throughout the project limits to improve accessibility and nighttime visibility.
  • Project improvements along northbound SR 7/US 441 consist of repaving the roadway from Oakes Road to Riverland Road to reconfigure the roadway from three to two lanes to enhance traffic operations to and from interstate ramps.
  • Widening the westbound S.R. 84 exit ramp to northbound U.S. 441/S.R. 7 to enhance safety by improving sight distance visibility.
  • Widening the eastbound SR 862/I-595 exit ramp to northbound U.S. 441/S.R. 7 from one lane to two lanes to improve traffic operations.
  • Constructing a new shared-use path from Oakes Road to just south of the South Fork New River (C-12) Canal.
  • Installing a bridge barrier separation along northbound U.S. 441/S.R. 7 over the South Fork New River (C-12) Canal to enhance shared-use path safety.
  • Constructing a new sidewalk along northbound U.S. 441/S.R. 7 from Orange Drive to Oakes Road to enhance pedestrian connectivity.
  • Installing new light poles with LED fixtures at shared-use path crossings to improve nighttime visibility.
  • Installing a new traffic signal mast arm at the intersection of U.S. 441/S.R. 7 and Riverland Road to enhance traffic flow.
  • Upgrading sidewalk curb ramps, signage, and pavement markings throughout the project limits to improve accessibility and nighttime visibility.