State Road (S.R.) 7/U.S. 441 Resurfacing, Restoration and Rehabilitation (RRR) Project

Road: S.R. 7

Areas: Southern

Project Number: 447670-1-52-01

Project Length: 3.403 miles

Project Limits: S.R. 7/US 441 from north of SR 808/Glades Road to north of Bridgebrook Drive.

Start Date: July 8, 2025

Completion Date: Late 2026

Contractor: Weekley Asphalt Paving, Inc.

Estimated Construction Cost: $9,500,000

Point of Contact:

Melissa Readling, Community Outreach Specialist, Phone:(772) 577-8803, Email: mreadling@corradino.com

Scope of Work

  • The project improvements consist of milling and repaving the existing roadway throughout the project limits to enhance infrastructure resilience and improve safety for the community.
  • Restriping the roadway to provide seven-foot-wide bicycle lanes throughout the project limits to enhance cyclist safety.
  • Constructing a new six-foot-wide sidewalk along the east side of SR 7/US 441 from the West Boca Plaza to Kimberly Boulevard to enhance pedestrian accessibility.
  • Upgrading curb ramps and replacing sections of the existing sidewalk to enhance safety and connectivity for pedestrians.
  • Upgrading pedestrian signals with new LED countdown timers at Kimberly Boulevard, New England Boulevard, CR 794/Yamato Road, Boca Chase Drive/Boca Gardens Parkway, and Clint Moore Road to enhance pedestrian accessibility.
  • Upgrading lighting for pedestrian crosswalks at all signalized intersections for pedestrian and motorist safety.
  • Upgrading signage and pavement markings, including installing green bicycle markings at right turn lanes, to enhance visibility and safety.