State Road (S.R.) 7/U.S. 441 Transit Corridor Improvements Project (Group 7)

Road Number: S.R. 7

County: Broward

Contract Number: T4685

Project Number: 429576-7-52-01, 429576-7-52-02, 429576-7-52-03

Project Length: 2.424 miles

Project Limits: Along NW 16th Street, NW 19th Street, and NW 26th Street; from NW 49th Avenue to State Road (SR) 7/US 441

Start Date: January 2025

Completion Date: Fall 2026

Contractor: Horizon Contractors, Inc.

Estimated Construction Cost: $5,530,214

Point of Contact:

Erik Nemati, P.E. — FDOT Construction Manager
erik.nemati@dot.state.fl.us or (954) 299-6441

Matthew Pearson — FDOT Project Administrator
matthew.pearson@dot.state.fl.us or (954) 958-7683

Cindy Moshette — Assistant Community Outreach Specialist
cindy@holtcommunications.net or (786) 559-0601

Scope of Work and Project Improvements

  • Milling and resurfacing the existing roadway from NW 43rd Avenue to SR 7/US 441 to ensure long-term resilience
  • Minor roadway widening throughout project limits to accommodate 5-foot bicycle lanes
  • Adding a continuous 5-foot concrete sidewalk in each direction within project limits to enhance safety and connectivity for pedestrians
  • Upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility
  • Milling and resurfacing the existing roadway from NW 47th Avenue to SR 7/US 441 to ensure long-term resilience
  • Minor roadway widening throughout project limits to accommodate 5-foot bicycle lanes
  • Adding a continuous 5-foot concrete sidewalk in each direction within project limits to enhance safety and connectivity for pedestrians
  • Upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility
  • Milling and resurfacing the existing roadway from NW 49th Avenue to NW 46th Avenue and NW 42nd Avenue to SR 7/US 441 to ensure long-term resilience
  • Minor roadway widening throughout project limits to accommodate 5-foot bike lanes
  • Adding a continuous 5-foot concrete sidewalk in each direction within project limits to enhance safety and connectivity for pedestrians
  • Upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility

 

Traffic Impacts

  • Lane closures along NW 16th Street, NW 19th Street, and NW 26th Street are permitted daily as needed, 7:00 a.m. until 7:00 p.m.
  • Motorist and pedestrian access to businesses and residences will be maintained at all times