State Road (S.R.) 7/U.S. 441 Transit Corridor Improvements Project (Group 8)

Road: S.R. 7

Areas: Northwest

Project Number: 429576-8-52-01, 429576-8-52-02, 429576-8-52-03

Project Length: SW 72nd Avenue: 0.50 miles; SW 25th Street: 0.52 miles; SW 33rd Street: 0.26 miles

Project Limits: SW 72nd Avenue from S.R. 824/Pembroke Road to SW 9th Street; SW 25th Street from SW 64th Avenue to SR 7/US 441; and SW 33rd Street from SW 62nd Avenue to S.R. 7/US 441.

Start Date: April 2025

Completion Date: Early 2026

Contractor: Leon America Construction

Estimated Construction Cost: $2,216,644

Point of Contact:

Angel Breedlove, Community Outreach Specialist, Phone:(786) 494-6211, Email: abreedlove@corradino.com

Scope of Work

  • Project improvements along SW 72nd Avenue consist of milling and resurfacing the existing roadway within the project limits to ensure long-term resilience
  • Minor roadway widening throughout project limits to accommodate 5-foot bike lanes.
  • Removing foliage as necessary to construct a continuous concrete sidewalk throughout the corridor to enhance safety and connectivity for pedestrians
  • Upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility.
  • Project improvements along SW 25th Street consist of removing foliage as necessary to construct a continuous concrete sidewalk throughout the corridor to enhance safety and connectivity for pedestrians.
  • Upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility; and constructing a new bus shelter at S.R. 7/U.S. 441 and SW 25th Street.
  • Project improvements along SW 33rd Street consist of removing foliage as necessary to construct a continuous concrete sidewalk throughout the corridor to enhance safety and connectivity for pedestrians; and upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility.