State Road (S.R.) 7/U.S. 441 Transit Corridor Improvements Project (Group 9)

Road: S.R.7

Areas: Northwest

Project Number: 429576-9-52-01, 429576-9-52-02

Project Length: SW 45th Street/Orange Drive: 0.421 miles; Taft Street: 1.49 miles

Project Limits: SW 45th Street/Orange Drive from Florida’s Turnpike to United States (U.S.) 441/S.R. 7 and Taft Street from U.S. 441/S.R. 7 to N 40th Street

Start Date: September 2024

Completion Date: Summer 2025

Contractor: Stout Group

Estimated Construction Cost: $3,298,227

Point of Contact:

Angel Breedlove, Community Outreach Specialist, Phone: (786) 494-6211, Email: abreedlove@corradino.com

Scope of Work

  • Project improvements along SW 45th Street/Orange Drive consist of upgrading existing drainage structures to improve long-term resilience and longevity of critical infrastructure.
  • Adding a continuous concrete sidewalk along the north side of SW 45th Street/Orange Drive to enhance safety and connectivity for pedestrians.
  • Upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility.
  • Project improvements along Taft Street consist of milling and resurfacing the existing roadway within the project limits to ensure long-term resilience.
  • Upgrading existing drainage structures to improve long-term resilience and longevity of critical infrastructure.
  • Adding an 8-foot to 11-foot shared-use path along the north side of Taft Street to enhance safety and connectivity for pedestrians
  • Upgrading curb ramps, pavement markings, and signage to improve visibility and accessibility.