State Road (S.R.) 80/Southern Boulevard Ramps and S.R. 7/United States (U.S.) 441

Road: S.R. 80

Areas: Western

Project Number: 437868-1-52-01

Project Length: 0.779 miles

Project Limits: S.R. 80/Southern Boulevard Ramps and U.S. 441/S.R. 7

Start Date: January 2026

Completion Date: Summer 2027

Contractor: General Asphalt Company, LLC

Estimated Construction Cost: $8.3 million

Point of Contact:

Kevin Wells, Community Outreach Specialist, Phone: 728-235-7218, Email: kevin@holtcommunications.net

Scope of Work

  • The project improvements include milling and repaving the roadway throughout the project limits to enhance infrastructure resilience and improve safety for the community.
  • Widening the roadway and the C-51 canal bridge to accommodate dual right-turn lanes along northbound and southbound S.R. 7/U.S. 441, triple left-turn lanes along the eastbound and westbound S.R. 80/Southern Boulevard ramps, and dual right-turn lanes along the eastbound and westbound S.R. 80/Southern Boulevard ramps to improve traffic flow and capacity.
  • Reconstructing and signalizing the U-turns at the eastbound and westbound S.R. 80/Southern Boulevard ramps to enhance vehicular safety.
  • Upgrading curb ramps and replacing sections of the existing sidewalk to improve pedestrian safety and connectivity.
  • Constructing new traffic signal mast arms to accommodate the turn lanes along S.R. 7/U.S. 441 and the S.R. 80/Southern Boulevard ramps
  • Upgrading pedestrian signals with new LED countdowns at intersections throughout the project corridor to enhance pedestrian use.
  • Retrofitting and installing new LED lighting to improve motorist awareness and pedestrian visibility at night.
  • Upgrading signage and pavement markings, including installing green bicycle markings, to enhance visibility and safety.