DRAG
img

Search here

State Road (S.R.) 823/Flamingo Road Resurfacing, Restoration, and Rehabilitation (RRR) Project

Road: S.R. 823

Areas: Southwest

Project Number: 447680-1-52-01, 447680-1-52-02

Project Length: 1.03 miles

Project Limits: From SR 820/Pines Boulevard to Pembroke Road

Start Date: January 2025

Completion Date: Fall 2025

Contractor: Weekley Asphalt Paving, Inc.

Estimated Construction Cost: $3,165,008

Point of Contact:

Alejandra Pozo, Assistant Community Outreach Specialist, Phone: (561) 690-1807, Email: apozo@corradino.com

Scope of Work

  • Project improvements consist of milling and resurfacing the existing roadway within the project limits to ensure long-term infrastructure resilience.
  • Constructing a right-turn lane along eastbound Pembroke Road to southbound S.R. 823/Flamingo Road to improve vehicular capacity.
  • Replacing the traffic signal mast arm at the northeast corner of Pembroke Road and S.R. 823/Flamingo Road to enhance traffic safety, and improve signal visibility.
  • Upgrading existing pedestrian signals at signalized intersections to improve push button accessibility.
  • Upgrading concrete sidewalks, curb ramps, pavement markings, and signage to improve visibility and accessibility.
  • Installing new light poles with LED fixtures at the intersections of Washington Street and Pembroke Road to improve safety and enhance nighttime visibility.

Documents

Project Photos

During Construction

Useful Links