DRAG
img

Search here

State Road (S.R.) 838/Sunrise Boulevard at S.R. 9/I-95 Interchange Improvements and Resurfacing, Restoration, and Rehabilitation (RRR) Project

Road: S.R. 838

Areas: Interstates

Project Number: 432551-41-52-01, 447678-1-52-01/02

Project Length: 2.3 miles

Project Limits: From S.R. 9/I-95 to S.R. 5/US 1

Start Date: June 2025

Completion Date: Early 2029

Contractor: GLF Posillico JV

Estimated Construction Cost: $55,449,488

Point of Contact:

Angel Breedlove, Community Outreach Specialist, Phone: (786) 494-6211, Email: abreedlove@corradino.com, Para información y preguntas en Español, por favor llame al (954) 777-4302.

Scope of Work

  • Project improvements consist of widening S.R. 838/Sunrise Boulevard at the S.R. 9/I-95 Interchange overpass to accommodate dual right turn lanes onto northbound and southbound S.R. 9/I-95 to improve vehicular capacity and operations
  • Widening the southbound S.R. 9/I-95 (Exit 29) off-ramp to accommodate triple left and triple right turn lanes onto SR 838/Sunrise Boulevard to improve vehicular capacity and operations
  • Milling and resurfacing the existing roadway within the project limits to ensure long-term infrastructure resilience
  • Installing new light poles with LED fixtures at the S.R. 9/I-95 Interchange to enhance nighttime visibility
  • Installing Wrong-Way Driver detection systems on all ramps at the S.R. 9/I-95 Interchange to improve vehicular safety
  • Upgrading existing signalization features to improve pushbutton accessibility and enhance pedestrian safety
  • Adding a shared-use path on the S.R. 838/Sunrise Boulevard bridge over S.R. 9/I-95 to enhance pedestrian connectivity
  • Upgrading sidewalk curb ramps, pavement markings, and signage to enhance visibility and accessibility.

Documents

Project Photos

Pre Construction

During Construction

Useful Links