State Road (S.R.) 93/I-75/Alligator Alley Resurfacing, Restoration, and Rehabilitation (RRR) Project – Section 1

Road Number: I-75

County: Broward

Contract Number: T4676

Project Number: 444122-4-52-01, 444122-4-52-02

Project Length: 14.01 miles

Project Limits: Broward/Collier County Line to Mile Post (MP) 31.261

Start Date: September 2024

Completion Date: Summer 2026

Contractor: OHLA USA, Inc.

Estimated Construction Cost: $27,933,983

Point of Contact:

Trisha Rangil, Community Outreach Specialist, Phone: (754) 283-2929, Email: trisha.rangil@exp.com, Para información y preguntas en Español, por favor llame al (954) 777-4302.

Scope of Work and Project Improvements

 

  • The project improvements include milling and resurfacing the roadway within project limits to ensure long-term resilience.
  • Installing guardrail within project limits to enhance safety.
  • Upgrading signing and pavement markings within the project limits to enhance nighttime visibility.

Traffic Impacts

  • Single lane closures along SR 93/I-75 are permitted Sundays at 9:00
    p.m. until Fridays at 6:00 p.m.
  • Extended single lane closures at bridge locations are permitted, as
    needed, for guardrail replacement.
  •  Single ramp closures at the Snake Road interchange will be required
    for milling and resurfacing the off and on ramps. This operation will be
    scheduled from 9:00 p.m. until 11:00 a.m. on Friday and/or Saturday
    nights. Detours will be in place to direct motorists and advanced notice
    will be provided.
  •  Access to rest areas and boat ramps may be temporarily closed, as
    needed, during nighttime paving operations. Closures will be restricted
    to one ramp at a time.