State Road (S.R.) 93/I-75 Interchange at Royal Palm Boulevard Improvements Project

Road Number: I-75

Contract Number: T4710

Project Number: 421548-6-52-01, 421548-7-52-01

Project Length: 3.1 miles

Project Limits: From S.R. 818/Griffin Road to SW 14th Street

Start Date: September 2025

Completion Date: Summer 2028

Contractor: OHLA USA Inc.

Estimated Construction Cost: $36,200,000

Point of Contact:

Christopher Comprosky, P.E. — FDOT Project Manager

Christopher.Comprosky@dot.state.fl.us or (954) 547-2807

Sara Duffoo, P.E. — Senior Project Engineer

SDuffoo@pinnaclecei.com or (305) 216-8840

Pedro Perez — Project Administrator

PPerezjr@pinnaclecei.com or (786) 405-3145

Trisha Rangil — Community Outreach Specialist

Trisha.rangil@exp.com or (754) 283-2929

Scope of Work and Project Improvements

 

  • Project improvements consist of widening the S.R. 93/I-75 mainline to add an additional lane and enhance entry and exit movements.
  • Widening the S.R. 93/I-75 exit and entrance ramps at Royal Palm Boulevard and S.R. 818/Griffin Road to increase storage capacity and enhance traffic flow.
  • Widening the SR 93/I-75 bridge over the C-11 Canal to support the S.R. 93/I-75 mainline expansion and enhance traffic flow.
  • Installing Wrong-Way Driver Detection Systems at key locations to enhance safety: southbound S.R. 93/I-75 exit ramp to westbound Royal Palm Boulevard, northbound SR 93/I-75 exit ramp to westbound Royal Palm Boulevard, and northbound S.R. 93/I-75 exit ramp to westbound S.R. 818/Griffin Road.
  • Milling and resurfacing the roadway within the project limits to ensure long-term infrastructure resilience.
  • Upgrading signing and pavement markings within the project limits to enhance nighttime visibility
  • Upgrading existing light poles with new LED fixtures and installing additional poles throughout the project limits to enhance nighttime visibility.