DRAG
img

Search here

State Road (S.R.) A1A Resurfacing, Restoration and Rehabilitation Project

Road: S.R. A1A

Areas: Northern

Project Number: 446176-1-52-01

Project Length: 1.835 miles

Project Limits: From south of the John D. MacArthur State Park Entrance to Portage Landing North

Start Date: February 17, 2025

Completion Date: Late 2025

Contractor: Florida Engineering & Development Corp.

Estimated Construction Cost: $3.9 million

Point of Contact:

Silvana Ojeda, Community Outreach Specialist, Phone: (561) 905-0167, Email: sojeda@corradino.com

Scope of Work

  • The project improvements consist of milling and repaving the existing roadway within project limits to ensure long-term resilience.
  • Widening the shoulders to provide 4-foot to 8-foot designated bike lanes in each direction of S.R. A1A from south of the John D. MacArthur State Park entrance to Portage Landing North to enhance bicyclist accessibility and safety.
  • Reconstructing pedestrian sidewalk curb ramps to meet current Americans with Disability Act (ADA) standards.
  • Replacing the mast arm traffic signal system to meet current hurricane design standards to ensure motorist safety.
  • Upgrading pedestrian signals at signalized intersections to improve push button accessibility.
  • Upgrading vehicle detection system and in-road sensors to improve traffic flow.
  • Upgrading lighting at the Lost Tree Village/Old Harbour Road intersection to enhance motorist and pedestrian visibility.
  • Upgrading pavement markings and signs to improve visibility and accessibility for motorists

Documents

Project Photos

Pre Construction

During Construction

Useful Links