DRAG
img

Search here

State Road (S.R.) A1A/South Ocean Boulevard Drainage Improvements Project

Road Number: S.R. A1A

Local Road Name: South Ocean Drive

County: Broward

Contract Number: T4681

Project Number: 448574-1-52-01, 448576-1-52-01, 448577-1-52-01

Project Length: 0.849 miles

Project Limits: From Sherman Street to SR 822/Sheridan Street, from Franklin Street to Walnut Street, and from Crocus Terrace to Van Buren Street

Start Date: June 2025

Completion Date: Summer 2028

Contractor: Mastec Civil, LLC

Estimated Construction Cost: $34,300,000

Point of Contact:

Jesus Sarmiento, P.E. — FDOT Construction Project Manager

jesus.sarmiento@dot.state.fl.us or (954) 218-1465

Victor Zarzuela, P.E. — Senior Project Engineer

vzarzuela@fj-group.com or (786) 718-9981

Rebecca Guerrero — Community Outreach Specialist

rguerrero@pinnaclecei.com or (754) 444-0093

Scope of Work and Project Improvements

 

  • This project aims to enhance the safety, resiliency, and longevity of the infrastructure for our communities.
  • The project improvements consist of installing four stormwater pump stations and drainage structures near the intersections of SR A1A/South Ocean Boulevard and Azalea Terrace, Van Buren Street, Sherman Street, and Franklin Street to enhance long-term infrastructure resilience.
  • Installing a seawall along SR A1A/South Ocean Boulevard from Sherman Street to SR 822/Sheridan Street and from Palm Street to Walnut Street to enhance long-term infrastructure resilience
  • Reconstructing sidewalks and the roadway affected by pump station and seawall installation.

Video

Documents

Project Photos

Pre Construction

Useful Links