State Road (S.R.) 5/U.S. 1 Public Transportation Shelters Project From Palmetto Park Road to S.R. 850/Northlake Boulevard

Road Number: S.R. 5

Local Road Name: U.S. 1

County: Palm Beach

Contract Number: T4723

Project Number: 438386-4-52-01/02

Project Length: 32.9 miles along S.R. 5/U.S. 1 

Project Limits: Various Locations from Palmetto Park Road in the City of Boca Raton to S.R. 850/Northlake Boulevard in the City of West Palm Beach

Start Date: October 2026

Completion Date: Summer 2027

Contractor: Weekley Asphalt Paving, Inc.

Estimated Construction Cost: $2.3 million

Point of Contact:

Ricky Estripeaut, P.E. — FDOT Project Manager 
Ricky.estripeaut@dot.state.fl.us or (561) 370-1132

Timir Shah, MSCE, P.E. — Project Administrator
timir@pioneercei.com or (414) 687-6670

Kevin Wells — Community Outreach Specialist
Kevin@holtcommunications.net or (728) 235-7218

Scope of Work and Project Improvements

  • Enhancing bus shelters along S.R. 5/U.S. 1 with covered seating, accessibility features for riders with disabilities, and bike racks for cyclists to support multi-modal travel.
  • Upgrading lighting with solar security lights for improved visibility at the bus shelters.
  • Installing real-time bus arrival information displays for riders’ convenience and travel planning.
  • Upgrading sidewalks, curb ramps, pavement markings, pedestrian signals, and signage incidental to the proposed bus shelter construction within the project limits.

Traffic Impacts

  • Single-lane lane closures along S.R. 5/U.S. 1 are permitted, 10:00 a.m. to 2:00 p.m., and 8:00 p.m. to 7:30 a.m. at the following locations:
    • NE 20th Street in the City of Boca Raton
    • Spanish River Boulevard in the City of Boca Raton
    • Lindell Boulevard in the City of Delray Beach
    • Linton Boulevard in the City of Delray Beach
    • Lantana Road in the Town of Lantana
    • Gregory Road in the City of West Palm Beach
    • Northwood Road in the City of West Palm Beach
  • Construction will not take place simultaneously on both sides of the road. Work will be completed at a maximum of two bus shelters at a time.
  • Temporary sidewalk closures and pedestrian detours will be implemented during active construction. Please follow directional signage and proceed with caution through the work zone.
  • Temporary bus stops will be provided for existing bus shelter impacts as needed.
  • Business and residential access will be maintained at all times.
  • Additional information about lane closures, detours, and pedestrian impacts will be provided in the weekly traffic report distributed by FDOT and can be viewed using the following link: FDOT Palm Beach County Construction (d4fdot.com)