State Road (S.R.) 5/U.S. 1 Resurfacing Project

Road Number: S.R. 5

Local Road Name: U.S. 1

County: Palm Beach

Contract Number: T4740

Project Number: 438386-5-52-01

Project Length: 1.3 miles

Project Limits: From Camino Real to NE 8th Street/Mizner Boulevard

Start Date: August 2026

Completion Date: Late 2027

Contractor: General Asphalt Company, LLC

Estimated Construction Cost: $6.3 million

Point of Contact:

Ricky Estripeaut, P.E. — FDOT Project Manager
ricky.estripeaut@dot.state.fl.us or (561) 370-1132

Hemberth “Chief” Salazar, P.E.  — Project Administrator
hemberths@azimuth360.cc or (786) 306-9269

Kevin Wells — Community Outreach Specialist
kevin@holtcommunications.net or (728) 235-7218

 

Scope of Work and Project Improvements

  • Milling and resurfacing the roadway throughout the project limits to ensure long-term infrastructure resiliency.
  • Repurposing the roadway from Camino Real to SE Mizner Boulevard/SE 5th Street by eliminating the 11-foot outside lane and narrowing the median to provide 7-foot separated bike lanes and 11-foot wide sidewalks.
  • Narrowing the median from SE Mizner Boulevard/SE 5th Street to NE Mizner Boulevard/NE 8th Street to provide 7-foot separated bike lanes.
  • Adding a new signalized mid-block crosswalk with increased lighting south of Plaza Real and upgrading pedestrian push buttons and signal heads at signalized intersections throughout the project corridor to enhance safety and connectivity for pedestrians.
  • Replacing existing traffic signals with mast arms at the intersection of S.R. 5/U.S. 1 and Camino Real for long term resiliency.
  • Constructing a second left-turn lane at the intersection of northbound S.R. 5/U.S.1 and Camino Real to improve intersection operations and capacity.
  • Modifying curb ramps and pedestrian detectors to meet ADA criteria, and replacing and upgrading signing and pavement markings to improve visibility and accessibility.

Traffic Impacts

  • Single-lane closures are permitted along S.R. 5/U.S. 1 between Camino Real and SE 5th Street/SE Mizner Boulevard with no restrictions in either direction.
  • Two-lane closures are permitted along S.R. 5/U.S.1 between Camino Real and SE 5th Street/SE Mizner Boulevard during non-peak hours on non -event days, nights, and weekends as follows:
    • Northbound lanes: 10:30 a.m. to 4:30 p.m. and 6:30 p.m. to 7:30 a.m.
    • Southbound lanes: 7:30 p.m. to 12:30 p.m.
  • Single-lane closures are permitted along S.R. 5/U.S.1 between SE 5th Street/SE Mizner Boulevard and NE 8th Street/NE Mizner Boulevard during non-peak hours on non-event days, nights, and weekends as follows:
    • Northbound lanes: 7:30 p.m. to 8:00 a.m.
    • Southbound lanes: 7:30 p.m. to 11:30 a.m.
  • Access to businesses and residences will be maintained at all times.
  • The speed limit within the project limits will remain at 35 mph.
  • Additional information about lane closures and pedestrian impacts will be provided in the weekly traffic report distributed by FDOT and can be viewed using the following link: FDOT Palm Beach County Construction (d4fdot.com)