DRAG
img

Search here

State Road (S.R.) 805/ United States (U.S.) 1/ North Dixie Highway and S.R. 9/ I-95 Lighting Project

Road Number: S.R. 805/U.S. 1

Local Road Name: North Dixie Highway

County: Palm Beach

Contract Number: T4743

Project Number: 447551-1-52-01, 447553-1-52-01

Project Length: 1.32 miles; 1.92miles

Project Limits: S.R. 805/ U.S. 1/ North Dixie Highway from north of Lucerne Avenue to the West Palm Beach Canal, and along S.R. 9/ I-95 from 12th Avenue South to 10th Avenue North

Start Date: May 2026

Completion Date: Spring 2027

Contractor: SICE Inc.

Estimated Construction Cost: $2.5 million

Point of Contact:

Davanan Harry — FDOT Project Manager

davanan.harry@dot.state.fl.us or (561) 871-3442

Yuriel Addine, P.E. — Project Administrator

yaddine@epluseng.com or (786) 873-7854

Kevin Wells — Community Outreach Specialist

kevin@holtcommunications.net or (728) 235-7218

 

Scope of Work and Project Improvements

  • S.R. 805/U.S. 1/North Dixie Highway
    • Retrofitting and installing new LED lighting along S.R. 805/ North Dixie Highway to improve nighttime visibility and safety.
    • Removing existing light fixtures along S.R. 805/ North Dixie Highway.
    • Upgrading curb ramps and replacing sections of the existing sidewalks to improve pedestrian safety and connectivity.
  • S.R. 9/I-95
    •  Replacing the existing lighting fixtures with new LED luminaires on I-95 from 12th Avenue South to 10th Avenue North to improve illumination and enhance visibility for motorists.

 

Traffic Impacts

  • S.R. 805/U.S. 1/North Dixie Highway
    • Nightly lane closures along S.R. 805/ North Dixie Highway are permitted from 8:00 p.m. to 6:00 a.m.
    • Sidewalk and curb ramp closures will be implemented as needed with temporary pedestrian detours.
  • S.R. 9/ I-95
    • Nightly lane closures are permitted from 10:00 p.m. to 6:00 a.m. on weekdays and weekends.

 

Video

Documents

Useful Links