U.S. 27/State Road (S.R.) 25 Everglades Agricultural Area (EAA) Reservoir Inflow-Outflow Canal Bridges Project

Road Number: U.S. 27/S.R. 25

County: Palm Beach

Contract Number: T4736

Project Number: 448136-1-52-01

Project Length: 0.37 miles

Project Limits: Located 27 miles north of the U.S. 27/I-75 Interchange

Start Date: January 5, 2026

Completion Date: Fall 2028

Contractor: Prince Contracting, LLC

Estimated Construction Cost: $20.9 million

Point of Contact:

Daniel Sanchez, P.E. — FDOT Project Manager
daniel.sanchez@dot.state.fl.us or (954) 629-5594

Ricardo Baraybar, P.E. — Senior Project Engineer
rbaraybar@wsbeng.com or (813) 235-3056

Andres Atehortua, P.E. — Project Administrator
andresa@wsbeng.com or (786) 236-0791

Kevin Wells — Community Outreach Specialist
kevin@holtcommunications.net or (728) 235-7218

Scope of Work and Project Improvements

• Dredging a new canal in partnership with South Florida Water Management District for future connection to the EAA reservoir.
• Constructing northbound and southbound U.S. 27/S.R. 25 bridges over the South Florida Water Management District canal to facilitate enhanced stormwater resiliency.
• Milling and repaving the roadway throughout the project limits to enhance infrastructure resilience and safety.
• Constructing drainage and roadside swales for stormwater treatment and storage.
• Installing guardrail and concrete barrier walls to enhance motorist safety.
• Upgrading signage and pavement markings to enhance visibility and safety.

Traffic Impacts

  • Work will occur in phases to minimize impacts to the public.
  • Lane closures may occur as needed and advance-notice signage will be posted on site.
  • The speed limit within the project limits will be reduced from 65 mph to 55 mph.
  • Access to local agricultural fields will be maintained at all times; however, access to the south entrance of the EAA will be through the north access point during construction of the southbound bridge.
  • Temporary closure of the existing agricultural bridge will be in place while construction activities are completed.
  • Access to adjacent properties will be maintained at all times.
  • Additional information about lane closures, detours, and pedestrian impacts will be provided in the weekly traffic report distributed by FDOT and can be viewed using the following link: FDOT Palm Beach County Construction (d4fdot.com)