Utopia Drive from Riviera Boulevard to Pembroke Road

Local Road Name: Utopia Drive

County: Broward

Contract Number: T4726

Project Number: 445524-1-52-01

Project Length: 1.343 miles

Project Limits: Utopia Drive from Riviera Boulevard to Pembroke Road

Start Date: March 2026

Completion Date: Summer 2026

Contractor: Pedrail Systems LLC

Estimated Construction Cost: $1,400,000

Point of Contact:

Erik Nemati, P.E. — FDOT Construction Manager
erik.nemati@dot.state.fl.us or (954) 958-7671

Donald Cooper — FDOT Construction Administrator
donald.cooper@dot.state.fl.us or (954) 870-3753

Cindy Moshette — Assistant Community Outreach Specialist
cindy@holtcommunications.net or (786) 559-0601

Salvador Zuniga, P.E. — City of Miramar Engineer
sezuniga@miramarfl.gov or (954) 602-3323

Scope of Work and Project Improvements

  • Milling and resurfacing the existing pathway within the project limits to ensure long-term infrastructure resiliency.
  • Replacing existing light poles to improve nighttime visibility.
  • Installing benches within the project limits to enhance accessibility for users.
  • Installing new guardrail at each intersection for increased pedestrian and vehicle safety.
  • Upgrading signage within the project limits.

Traffic Impacts

  • Temporary lane closures will occur one lane at a time on Utopia Drive from Riviera Boulevard to S.R. 824/Pembroke Road, as needed, from 8:00 a.m. until 6:00 p.m., Monday through Friday.
  • Motorist and pedestrian access to businesses and residences will be maintained at all times.

 