North Shore Pedestrian Bridge

Financial Number: 440015-1-52-01

Project Length: 0.07 Miles

Project Limits:

  • Pedestrian Bridge along the west side of North Shore Drive crossing the Carver Canal

Projected Letting: Winter 2023

Start Date: Summer 2024

Completion Date: Fall 2025

Estimated Construction Cost: $1.1 Million

Scope of Work:

  • Construct a prefabricated steel pedestrian bridge on the west side of North Shore Drive crossing the Carver Canal.
  • Realign pedestrian sidewalk path on the west side of North Shore Bridge to the new pedestrian bridge.
  • Replace and upgrade signage impacted by construction.
  • Add pedestrian lighting at the pedestrian bridge.

Construction Impacts:

  • Work will be done in phases to reduce the inconvenience to the community.
  • A detour will be required for a limited duration (approximately one week) to set the pedestrian bridge in place from the roadway.
  • The detour will not impact the pedestrians, as the portion of the bridge will be opened for pedestrians all the time.
  • Temporary lane closures will be required during non-peak hours.
  • Pedestrian and vehicular access to all properties will be maintained at all times.

Contact Information:

Documents

PDF Icon440015 Presentation

 

Project Photos

Project Photos

Click to view enlarged version/details
 
 
Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County
Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone