FDOT District Four - Palm Beach Header Image

SR 809/Military Trail at SR 882/Forest Hill Boulevard Intersection Improvements Project

Financial Number: 437878-1-52-01

Project Length: .705 miles

Project Limits: Intersection of Military Trail and Forest Hill Boulevard

Start Date: September 6, 2022

Completion Date: Winter 2024

Contractor: Zahlene Enterprises Inc.

Estimated Construction Cost: $7 million

Scope of Work:
The project improvements consist of widening, milling, and resurfacing along Military Trail and Forest Hill Boulevard, constructing additional right and left turn lanes on Military Trail and additional right turn lanes on Forest Hill Boulevard, installing new 5-foot bike lanes at various locations along Forest Hill Boulevard, improving sidewalks and driveways at the intersection of Military Trail and Forest Hill Boulevard, installing four new signal mast arms at the intersection, and installing new signage and pavement markings

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Documents:

PDF IconMilitary Trail_Forest Hill Blvd_ Project Information Flyer

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details
Water main deflection installation at NW corner    April 2024
Drainage pipe installation at the NW corner   April 2024 Widening Continuing Along Military Trail   May 2024 Bypass Installed on Existing Force Main to Perform Deflection for Proposed Drainage Structure on Military Trail   May 2024 Widening Continuing Along Military Trail North of Forest Hill Blvd   June 2024
Sidewalk and Driveway Replacement Along the West Side of Military Trail North of Forest Hill Blvd   June 2024 Clearing and Grubbing Along the North Side of Forest Hill Blvd. East of Military Trail   July 2024Asphalt Placement Continuing Along West Side of Military Trail North of Forest Hill Blvd   July 2024Drainage Installation on the North Side of Forest Hill Blvd. at Erie Terrace   August 2024
Clearing and Grubbing Along the East Side of Military Trail North of Forest Hill Blvd.   August 2024Curb and Gutter Curb Pad Installed on the North Side of Forest Hill Blvd. East of Erie Terrace   September 2024Roadway Widening Along the East Side of Military Trail North of Forest Hill Blvd   September 2024
 

Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County

Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone