Financial Number: 441466-1-52-01
Project Length: 0.092 miles
Project Limits:
- Eastbound SR 800/Spanish River Boulevard (Bridge no. 930266)
- Westbound SR 800/Spanish River Boulevard (Bridge no. 930154)
Virtual Public Meeting:
- No virtual public information workshop is scheduled for this project.
In-Person Public Information Meeting:
- No in-person public information workshop is scheduled for this project.
Projected Letting: Winter 2023
Construction Start Date: Summer 2023
Anticipated Completion Date: Summer 2024
Estimated Construction Cost: $3.2 Million
Scope of Work:
- Protecting the bridge foundations from erosion on the Eastbound and Westbound SR 800/Spanish River Boulevard Bridges.
Construction Impacts:
- Work will be done in the ICWW under the bridges. Marine traffic will be maintained at all times.
- Temporary lane closures on the frontage road during non-peak hours in order to minimize effect on traffic.
- Access to properties along the frontage road will be maintained throughout construction.
Project Benefits:
- Maintaining the strength and carrying capacity of the Spanish River Boulevard bridges.
- Ensuring a long-lasting life for both bridges.