Financial Number: 446101-1-52-01 and 446101-2-52-01
Project Length: 0.8 miles
Project Limits: SR 80/US 98/Southern Boulevard from East of Parker Avenue to West of Washington Road
Virtual Public Workshop:
Projected Letting: October 2022
Start Date: Winter 2023
Completion Date: Summer 2024
Estimated Construction Cost: $1.5 M
Scope of Work:
- Repaving the existing roadway.
- Reconstructing damaged sidewalks.
- Installing pedestrian countdown signal features and vehicle detection at crosswalks.
- Reconstructing sidewalk curb ramps that are substandard.
- Replacing bridge joints, painting of the steel portion, barrier wall and steel beam repairs to Bridge No. 930053
Construction Impacts:
- Temporary travel lane closures during nighttime non-peak hours.
- Detour will be utilized during nighttime non-peak hours for bridge closure to address joint replacement.
- Access to schools, businesses and residences will be maintained at all times.
- Removal of existing paint underneath the bridge over Georgia Avenue will be done during the day using flaggers to maintain traffic movement.