Financial Number: 446176-1-52-01
Project Length: 1.835 miles
Project Limits: from south of the John D. MacArthur State Park Entrance to Portage Landing North
Virtual Public Meeting: Tuesday, August 13, 2024, from 5:00 p.m. - 6:00 p.m. Use the following link to register: https://bit.ly/4cFq0cQ. You may also dial in via phone at (562) 247-8422 Access Code: 677-813-999
In-Person Presentation: Wednesday, August 14, 2024, from 6:00 p.m. - 7:00 p.m. at the North Palm Beach Library, Obert Meeting Room, located at 303 Anchorage Drive, North Palm Beach, FL 33408
Start Date: August 15, 2024
Completion Date: Summer 2025
Contractor: Florida Engineering & Development Corp.
Estimated Construction Cost: $3.9 million
Scope of Work:
The project improvements consist of milling and repaving the existing roadway within project limits to ensure long-term resilience, widening the shoulders to provide 4-foot to 8-foot designated bike lanes in each direction of SR A1A from south of the John D. MacArthur State Park entrance to Portage Landing North to enhance bicyclist accessibility and safety, reconstructing pedestrian sidewalk curb ramps to meet current Americans with Disability Act (ADA) standards, replacing the mast arm traffic signal system to meet current hurricane design standards to ensure motorist safety, upgrading pedestrian signals at signalized intersections to improve push button accessibility, upgrading video vehicle detection system and in-road sensors to improve traffic flow, upgrading lighting at the Lost Tree Village/Old Harbour Road intersection to enhance motorist and pedestrian visibility, upgrading pavement markings and signs to improve visibility and accessibility for motorists.
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
Documents:SR A1A RRR Project Flyer.pdf
|