. FDOT Palm Beach County Construction -: SR-A1A RRR Project
FDOT District Four - Palm Beach Header Image

SR-A1A RRR Project

Financial Number: 448417-1-52-01

Project Length: 2.4 miles

Project Limits:  State Road (SR) A1A/South Ocean Boulevard from North of Ibis Way to North of Emerald Beach Way

Project Purpose:  Repave and restripe the existing roadway to extend the service life of the pavement and enhance safety for motorists and cyclists.

Virtual Public Workshop: Wednesday, December 4, 2024, at 6:00 p.m. located at the Palm Beach Fire Rescue Station No. 3, 2185 South Ocean Boulevard, Palm Beach, Florida 33480. Free parking will be provided during the public meeting in Phipps Ocean Park (South of the Fire Station). The meeting will be offered in-person and virtually simultaneously. Link to registration page: https://tinyurl.com/448417-1-SR-A1A.

Projected Letting: August 2025

Anticipated Start Date: Fall 2025

Anticipated Completion Date: Spring 2027

Estimated Construction Cost: $3.2 Million

Scope of Work:

  • Repave the existing roadway to improve the resiliency of our infrastructure.
  • Widen the paved shoulders from 3-feet to 5-feet along both sides of SR A1A from Ibis Way to Sloan’s Curve to better accommodate cyclists who wish to use the roadway.
  • Install shared lane markings indicating cyclists should be expected in the lane from Sloan’s Curve to the north end of the project to increase driver awareness and increase safety for cyclists.
  • Upgrade signs and pavement markings to meet current standards and increase reflectivity.
  • Install advisory speed limit signs, painted speed limits on the pavement, and internally illuminated pavement markers on reverse curve approaches to improve safety for drivers by alerting them to the upcoming curves.
  • Replace existing 1,080 feet asphalt sidewalk with a 6-foot concrete sidewalk on the west side of SR A1A from north of Ibis Way to south of Sloan’s Curve.
  • Replace guardrail at Sloan’s Curve to improve safety for occupants of errant vehicles leaving the roadway.
  • Address flooding at 1800 South Ocean Boulevard by replacing the French drain system at that location, improving the safety of the roadway.

Construction Impacts: 

  • Work will be done in three (3) phases to reduce the impacts to the community.
  • During Phase I, the road will be narrowed to one lane to construct the drainage improvements in front of 1800 Block for approximately 270 feet for approximately six (6) weeks.
    • Traffic patterns will be maintained by flagger/temporary signal.
  • Lane closures will occur during daytime and nighttime hours on non-event days for Phase I.
  • Lane closures will occur during daytime hours on non-event days for Phases II and III.
  • Pedestrian traffic will be maintained within the existing sidewalk limits with a temporary walkway outside of the work zone.
  • Access to properties along the corridor will be maintained during construction.

Contact Information:

Project Photos

Typical Section 1: Typical Section Number 1 - Proposed Conditions: SR A1A from North of Ibis Way to North of Sloan’s Curve

Typical Section Number 2 - Proposed Conditions: SR A1A from SR A1A from North of Sloan’s Curve to Ocean View Road

Typical Section Number 3 - Proposed Conditions: SR A1A from Ocean View Road to North of Emerald Beach Way

Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County
Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone