State Road (S.R.) 811/Alternate A1A Resurfacing, Restoration, and Rehabilitation Project
Financial Number: 448435-1-52-01/02/03
Project Length: 3.31 miles
Project Limits: S.R. 811/Alt. A1A from RCA Boulevard to Donald Ross Road
Virtual Public Meeting:
Start Date: October 20, 2025
Completion Date: Summer 2026
Contractor: General Asphalt Company, LLC
Estimated Construction Cost: $5.9 million
Scope of Work: The project improvements consist of milling and repaving the roadway throughout the project limits to enhance infrastructure resilience and safety for the community; constructing a second left turn lane at RCA Boulevard to improve traffic flow and increase vehicular capacity; installing patterned pavement at intersections; upgrading curb ramps and replace sections of the existing sidewalk to improve pedestrian safety and connectivity; upgrading pedestrian signals with new LED countdown timers at intersections throughout the project corridor to enhance pedestrian safety and accessibility and upgrading signage and pavement markings, including installing green bicycle markings, to enhance visibility and safety.