State Road y (SR) 9/I-95 Interchange at Woolbright Road from south of Woolbright Road to north of Woolbright Road

Financial Number: 437279-1-52-01

Project Length: 1.697 Miles

Project Limits: State Road (SR) 9/I-95 Interchange at Woolbright Road from south of Woolbright Road to north of Woolbright Road

Project Purpose: To improve operations and safety within the interchange.

A Public Meeting Was Held: The public meeting was offered virtually and in-person.

The virtual public meeting took place on Wednesday, March 8, 2023, at 6:00 p.m. and was held via GoToWebinar.

The in-person public meeting followed an open house format and took place on Thursday, March 9, 2022, from 6:00 p.m. to 7:30 p.m. and was held at the Boynton Beach City Hall located at 100 East Ocean Avenue (Room – MR 115), Boynton Beach, FL 33435. Staff was available to answer questions and provide assistance.

Virtual Public Meeting:

Purpose of the Project: To improve operations and safety within the interchange.

Start Date: Fall 2026

Completion Date: Summer 2029

Estimated Construction Cost: $22 million

Scope of Work:

  • Repaving roadway along I-95 mainline, ramps and Woolbright Road
  • Widening I-95 off-ramps to triple left turn lanes
  • Widening I-95 on-ramps to three receiving lanes
  • Widening Woolbright Road within the interchange to three through lanes in both directions
  • Widening Woolbright Road bridges over Lake Worth Drainage District (LWDD) E-4 Canal, South Florida Rail Corridor (SFRC)/CSX Railroad and I-95
  • Providing shared use paths, sidewalks and designated bike lanes within the interchange in both directions
  • Providing dual eastbound and westbound left turn lanes at SW 8 Street/Corporate Drive intersection
  • Providing southbound triple left turn lanes at SW 8 Street/Corporate Drive intersection
  • Signing and Pavement Marking, Lighting, Drainage, Signalization, and Intelligent Transportation Systems (ITS)

Construction Impacts:

  • Work will be done in phases to reduce the inconvenience to the community
  • Lane closures, ramp closures, and detours will occur during non-peak hours to minimize impacts on traffic
  • Access to businesses and residential properties will be maintained at all times during construction

Contact Information:

Documents:

PDF IconState Road (SR) 9/I-95 Interchange at Woolbright Road from south of Woolbright Road to north of Woolbright Road Operation and Safety Interchange Improvements Presentation

PDF IconSFRC Railroad Bridge Typical Section

PDF IconI-95 Bridge Typical Section

PDF IconWoolbright Road Rendering

PDF IconI-95 @ Woolbright Rd Roll Plot (437279)

PDF IconE-4 Canal Bridge Typical Section

Click here for upcoming lane closures

 

Project Photos

During Construction

Click to view enlarged version/details

 

Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County
Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone