Financial Number: 449256-1-52-01
Project Length: 0.025 miles (approximately 132 feet)
Project Limits: Bridge over the Boynton Inlet
Virtual Public Workshop: No public information workshop is scheduled for this project.
Projected Letting: September 2025
Estimated Project Start: Fall 2025
Estimated Project Completion: Winter 2025
Estimated Construction Cost: $530K
Scope of Work:
- Replace the existing bridge coating.
- Waterproofing surface on the bridge concrete deck.
- Clean and coat concrete barriers.
- Miscellaneous concrete repairs.
Construction Impacts:
- The work will be done in phases to reduce any inconveniences to residences, businesses, parks and/or marinas adjacent to the project.
- Access to all residences, businesses and properties will remain open during construction.
- No full roadway closures are anticipated.
- Marine vessel traffic will be maintained at all times with possible closures on half the channel during bridge painting operations.
Point of Contact:
|