State Road (SR) A1A from south of County Road (CR) 782/East Linton Boulevard to north of SR 806/East Atlantic Avenue
Financial Number: 447662-1-52-01
Project Length: 1.599 miles
Project Limits: From south of E. Linton Boulevard to north of SR 806/E. Atlantic Avenue
Public Meeting: The public meeting will be held both in person and virtually simultaneously on Wednesday, September 20, 2023, at 6 p.m. at the Swinton Operations Complex located at 434 S. Swinton Avenue, Delray Beach, FL 33444.
Construction Start Date: Fall 2024
Completion Date: Winter 2025
Estimated Construction Cost: $2.15 million
Scope of Work:
Repaving the existing roadway from CR-782/E. Linton Boulevard to Casuarina Road
Installing pedestrian signal features at the Casuarina Road signal and at midblock crossings
Upgrading lighting at signalized intersections and midblock crossings
Construction Impacts:
Nighttime work will be performed within the project limits in non-residential areas
Flagging Operations will be used to direct one lane of traffic at a time
Work will be done in phases to reduce the effects of construction on the community
Access to properties adjacent to the corridor will be maintained throughout construction