Rail Traffic Monitoring Improvements Project at five State Road Crossings
Financial Number: 441759-1-52-01
Project Length: 4.3 miles
Project Limits: SR 816/Oakland Park Boulevard, SR 838/Sunrise Boulevard, SR 84/Marina Mile from SR 9/I 95 to SR 5/US 1, SR 824/Pembroke Road, and SR 858/Hallandale Beach Boulevard
Start Date: September 2023
Completion Date: Early 2024
Contractor: Signal Technology, Inc.
Estimated Construction Cost: $3.0 million
Scope of Work:
The project improvements consist of installing train detection systems at the Florida East Coast (FEC) Railroad crossings located at the SR 816/Oakland Park Boulevard, SR 838/Sunrise Boulevard, SR 84/Marina Mile Boulevard from SR 9/I-95 to SR 5/US 1, SR 824/Pembroke Road, and SR 858/Hallandale Beach Boulevard intersections. Installing fiber optic cable, overhead dynamic message signs and other Intelligent Transportation Systems (ITS) devices on SR 84 between SR 9/I-95 and SR 5/US 1. Additional improvements along SR 84 will include installing of
Microwave vehicle detection system (MVDS) in the vicinity of the FEC railway that will be connected to existing ITS cabinets at each of these corridors.
New FDOT fiber optic cable from SR 9/I-95 to SR 5/US 1.
Arterial dynamic message signs (ADMS), CCTV cameras, and Bluetooth devices.
Point of Contact:
"Para información y preguntas en Español, por favor llame al (954) 777-4302."