State Road (SR) 9/ I-95 Mobility Hub at Cypress Creek Road Improvements Project

Financial Number: 435808-5-52-01

Project Length: 2.42 miles

Project Limits: Cypress Creek Road from SR 845/Powerline Road to the South Florida Rail Crossing; N Andrews Way from N Andrews Avenue to the south terminus; and NW 59th Court from SR 845/Powerline Road to the Tri-Rail Station

Start Date: February 2024

Completion Date: Summer 2025

Contractor: StrongCore Group, LLC

Estimated Construction Cost: $8,148,235

Scope of Work: Project improvements include milling and resurfacing the roadway within project limits, modifying the median on Cypress Creek Road, adding a 10-foot Shared Use Path (SUP) along Cypress Creek Road, constructing new sidewalks along the north side of NW 59th Court and each direction of N Andrews Way, upgrading existing lighting to LED fixtures within project limits, installing new mast arms at the intersection of Cypress Creek Road and SR 845/Powerline Road, upgrading pedestrian signals at all signalized intersections within project limits, upgrading signage and pavement markings, and installing new landscape within project limits.

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Documents:

PDF IconI-95 Mobility Hub Improvements Project Flyer .pdf

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details
Concrete median removal   March 2024Low profile barrier wall installation   March 2024Installation of Traffic Separator   April 2024Drainage Installation   April 2024
C 6 drainage installation   May 2024 (2) C 6 drainage installation   May 2024 C 6 drainage installation   May 2024 (3) Concrete removal   May 2024 (2)
Concrete removal   May 2024 Concrete removal   May 2024 (3) Concrete removal   June 2024 (2) Concrete removal   June 2024
Median operations   July 2024.jpeg (2) Median operations   July 2024.jpeg Median operations   July 2024.jpeg (1) Drainage installation on westbound Cypress Crrek Road    November 2024
Drainage installation Cypress Creek Road    October 2024 Shared use path construction NW 59th Court    October 2024 Relocation of the low profile barrier wall on Cypress Creek southbound   October 2024 Light pole base installation North Andrews Way   October 2024
Concrete Curb and Gutter construction NW 59th Court    October 2024 Service Point installation on North Andrews Way    October 2024 (2) Excavation for the installation of curb and gutter westbound Cypress Creek    October 2024 Sidewalk construction on NW 59th Court    November 2024
Drainage installation on eastbound Cypress Creek Road    November 2024 Shared use path construction NW 59th Court    November 2024 Sidewalk pad construction on WB Cypress Creek Road   November 2024 Back filling behind shared use path   November 2024
Curb and Gutter Type F construction on NW 59th Court   November 2024 Drilled Shaft installation on Cypress Creek Road    November 2024 Drainage installaion on eastbound Cypress Crrek Road    November 2024
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero