State Road 820/Hollywood Boulevard Resurfacing, Restoration, and Rehabilitation Project from SR 5/US 1 to SR A1A/North Ocean Drive
Financial Number: 447654-1-52-01
Project Length: 1.851 miles
Project Limits: SR 820/Hollywood Boulevard from SR 5/US 1 to SR A1A/North Ocean Drive
Start Date: August 2024
Completion Date: Summer 2025
Contractor: Weekley Asphalt Paving, Inc.
Estimated Construction Cost: $6,226,524
Scope of Work:
Project improvements consist of milling and resurfacing the pavement along the project limits to enhance resiliency and safety, reconstructing the sidewalk along project limits, upgrading technology including pedestrian signals at the intersection of SR 820/Hollywood Boulevard and 13th Avenue, and upgrading existing lighting to LED fixtures along the project limits to enhance visibility and nighttime safety.