Financial Number: 433109-5-52-01, 02 / 412420-4-52-01, 435384-1-52-01
Project Length: 5.831 miles
Project Limits: I-95 from South of Glades Road to South of Linton Boulevard and Glades Road from NW 22nd Way to West University Drive
Start Date: November 7, 2019
Completion Date: February 1, 2024
Contractor: Prince Contracting LLC
Estimated Construction Cost: $148 million
Scope of Work: 95 Express Lanes Phase 3B-2 will extend the existing Express Lanes north from just south of Glades Road to south of Linton Boulevard in Palm Beach County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction; the number of General Use lanes will remain the same. Access to the Express Lanes will be provided via two designated ingress and egress locations between Glades Road and Congress Avenue. The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). Additional project improvements include overhead sign structure installation, Intelligent Transportation System (ITS) and Express Lane markers, new signalization, lighting, signing and pavement markings and ramp signalization at five interchanges from Glades Road to Linton Boulevard. Shoulder-mounted sound barrier walls will be constructed along I-95 northbound between Clint Moore Road and Linton Boulevard, ground-mounted sound walls will be installed on the south side of Yamato Road east of I-95 adjacent to the University Heights Community and along I-95 northbound south of Linton Boulevard adjacent to the Tierra Verde Community. The Clint Moore Road Bridge over I-95 will be fully reconstructed and the Glades Road bridge over the South Florida Regional Transportation Authority (SFRTA) railroad tracks and Military Trail and the I-95 bridge over the C-15 Canal (between Peninsula Drive and Linton Boulevard) will be widened.
Point of Contact:
"Para información y preguntas en Español, por favor llame al (954) 777-4302."
Documents:
January 2023 Monthly Progress Report
Glades Road Diverging Diamond Interchange (DDI) FAQs
Click here for more information on the SR-808/Glades Road and I-95 Diverging Diamond Interchange (DDI)
Project Photos
Drag the slider to see the progress of the Clint Moore Road Bridge reconstruction from August 2021 to August 2022!
|