FDOT District Four - Palm Beach Header Image

Current I-95 lane closures in Palm Beach County

Feb 26 - Mar 5, 2021

I-95 from south of SW 10th Street in the City of Deerfield Beach to south of Glades Road in the City of Boca Raton (95 Express Phase 3B-1)

Restrictions:

I-95 will have three lanes closed in each direction nightly, as needed, Sunday through Thursday nights, with the first lane closing at 9:30 p.m., the second lane closing at 10:30 p.m., and the third lane closing at 11:30 p.m. until 5:30 a.m.

I-95 northbound from south of SW 10th Street to south of Glades Road is in final configuration.

I-95 Northbound Full Closure Notice: I-95 northbound lanes at Hillsboro Boulevard will be closed to traffic overnight, Monday, March 1 through Thursday, March 4 for overhead sign structure installation. The first lane will close at 9:30 p.m., the second lane will close at 10:30 p.m., and all lanes will be closed by 11:30 p.m., reopening by 5:30 a.m. each morning. Traffic will be detoured via the northbound exit ramp to Hillsboro Boulevard west, Military Trail and Palmetto Park Road. FHP will be onsite to assist motorists. Please see detour flyer attached.

Advanced Notice: I-95 northbound, between Cypress Creek Road to Atlantic Boulevard, may have the inside lane closed, 9:30 p.m. until 5:30 a.m., Thursday night, March 11, for paving.

Advanced notice: I-95 northbound, between Cypress Creek Road and Atlantic Boulevard, may have three inside lanes closed, 11 p.m., Friday night, March 12 through 5 a.m., Monday morning, March 15, for milling and resurfacing and pavement marking activities.

Arterial Road Impact:

Palmetto Park Road at I-95 will have two lanes closed in each direction nightly, as needed, Sunday through Thursday. The first lane will close at 9 p.m., and the second lane will close at 10:30 p.m. All lanes will be opened by 5:30 a.m.

Palmetto Park Road at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 3:30 p.m., Monday through Friday.

Camino Real at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 4 p.m., Monday through Friday.

Ramp Impact:

The I-95 southbound exit ramp to Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via I-95 southbound, Hillsboro Boulevard, Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from eastbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.

The northbound entrance ramp from eastbound and westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 southbound to Hillsboro Boulevard to I-95 northbound.

The I-95 northbound exit ramp to westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Tuesday through Thursday. Motorists will be detoured via I-95, Palmetto Park Road and Military Trail. FHP will be on site to assist motorists.

The I-95 northbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.

The I-95 northbound exit ramp to eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Palmetto Park Road and South Dixie Highway. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m. Sunday through Thursday. Motorists will be detoured via Hillsboro Blvd, Military Trail and SW 10th Street. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and SW 10th Street. FHP will be on site to assist motorists.

The I-95 southbound exit ramp to SW 10th Street will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Hillsboro Blvd and Military Trail. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from eastbound and westbound SW 10thStreet will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via SW 10th Street, Military Trail and Sample Road. FHP will be on site to assist motorists. *Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.


I-95 from south of Glades Road to south of Linton Boulevard and SR 808/Glades Road from Renaissance Way to West University Drive in the Cities of Boca Raton and Delray Beach (95 Express Phase 3B-2)

Restrictions:

I-95 will have up to four lanes closed in each direction nightly as needed for paving, 9 p.m. until 6 a.m. Sunday through Thursday. The first lane will close at 9 p.m., the second lane will close at 9:30 p.m., and the third and fourth lane will close at 10 p.m.

I-95 northbound from Yamato Road to Linton Boulevard is in a new traffic pattern with traffic shifted to the outside to allow for median construction. This configuration is anticipated to be in place through summer 2021.

I-95 Northbound Full Closure Advanced Notice: I-95 northbound at Glades Road will be closed to traffic overnight Wednesday night, March 10 and Thursday night, March 11 for overhead sign structure removal. Motorists will be detoured via the I-95 northbound exit ramp to Glades Road, Federal Highway/US-1 and Yamato Road. Monday, March 15 and Tuesday, March 16 will be used as contingency nights if needed. FHP will be on site to assist motorists. Please see detour flyer attached.

Glades Road Impact:

Westbound Glades Road, between NW 22nd Way and West University Drive, will be shifted inside towards the median to allow for outside widening, beginning Monday, March 1. Please see informational flyer attached.

Westbound Glades Road, between NW 22nd Way and West University Drive, will have one lane closed daily, 9:30 a.m. until 4 p.m., Monday through Friday and from 6 a.m. until 9 p.m. Saturday and Sunday, beginning Monday, March 1.

Westbound Glades Road, between NW 22nd Way and West University Drive, will have one lane closed nightly at 9 p.m. and two lanes closed at 10 p.m., until 6 a.m., Sunday through Saturday, beginning Monday, March 1.

Clint Moore Road Impact:

Advanced Notice: The Clint Moore Road bridge over I-95 will be closed completely for reconstruction beginning 5 a.m., Monday morning, March 8, 2021. Crews are permitted to work 7 a.m. until 6 p.m. Monday through Friday and 8 a.m. until 7 p.m. on Saturday. No work is permitted on Sundays or holidays. Emergency access for first responders will be maintained throughout the duration of the closure. Westbound traffic will be detoured via NW 2ndAvenue, Yamato Road and Congress Avenue. Eastbound traffic will be detoured via Park of Commerce Boulevard, Congress Avenue, Yamato Road and NW 2nd Avenue. Local neighborhood access will be maintained; only the approaches and bridge over I-95 will be closed. The reconstruction of this bridge is anticipated to be completed in summer 2022. Please see detour flyer attached.

Ramp Impact:

The I-95 northbound entrance ramp from westbound Glades Road will be closed nightly as needed for paving, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road and Jog Road. FHP will be on site to assist motorists.

The I-95 northbound exit ramp to Spanish River Boulevard will be closed nightly as needed for paving, 11 p.m. until 5 a.m., Sunday and Thursday.Traffic will be detoured via I-95 north, Yamato Road east, US-1 and Spanish River Boulevard. FHP will be onsite to assist motorists.

The I-95 northbound entrance ramp from Congress Avenue and Peninsula Corp. Drive will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday and Thursday. Traffic will be detoured via I-95 and Yamato Road. FHP will be on site to assist motorists.

The I-95 northbound exit ramp to Congress Avenue will be closed nightly as needed for paving, 11 p.m. until 5 a.m., Sunday and Thursday. Traffic will be detoured via I-95 and Linton Boulevard. FHP will be on site to assist motorists.Consecutive ramps will not be closed at the same time.

The I-95 northbound entrance ramp from eastbound Glades Road will be closed nightly as needed,11 p.m. until 5 am., Sunday and Thursday. Traffic will be detoured via Glades Road east, N. Federal Highway and Yamato Road. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from westbound Glades Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday and Thursday. Traffic will be detoured via Glades Road west, Powerline Road and Palmetto Park Road. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from eastbound Yamato Road/Spanish River Boulevard will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Yamato Road east, Federal Highway/U.S. 1 south and Glades Road. FHP will be on site to assist motorists.

The I-95 northbound exit ramp to Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Congress Avenue, Peninsula Corp Drive, Congress Avenue and Yamato Road. FHP will be on site to assist motorists.


I-95 Interchange Improvements at Atlantic Avenue in the City of Delray Beach

Restrictions:

Atlantic Avenue from 13th Avenue to NW 23rd Avenue will have two through lanes closed daily, as needed, 10 a.m. until 2:30 p.m. and nightly, as needed, 9 p.m. until 5 a.m., Sunday through Saturday.

Westbound Atlantic Avenue approaching I-95 has a new permanent configuration. The northernmost, or far right lane, of westbound Atlantic Avenue which begins just west of NW 12th Avenue is now designated as I-95 entrance ramp ingress only. Vehicles traveling in this lane will not be able to perform a through movement to continue west on Atlantic Avenue due to the installation of a concrete traffic separator; this lane is exclusively designated for vehicles wishing to access I-95 northbound or southbound. Please note that motorists must decide on their selected movement before they reach NW 12th Avenue.

The Atlantic Avenue north sidewalk from 12th Avenue to NW 23 Avenue is closed completely for roadway reconstruction. Pedestrians will be detoured to the south sidewalk via existing crosswalks.

Congress Avenue from NW 1st Street to Lowson Boulevard may have one lane closed daily in each direction, as needed, daily, 10 a.m. until 2:30 p.m. and nightly, 9 p.m. until 5 a.m., Sunday through Saturday.

NW 12th Avenue will have the westbound turn lane closed, nightly as needed, 9 p.m. to 5 a.m., Sunday through Saturday.

The I-95 northbound entrance ramp from Atlantic Avenue will have one lane closed nightly, as needed, 9 p.m. until 5 a.m., Sunday through Saturday.


I-95 Milling and Resurfacing from North of Gateway Boulevard to Lantana Road in the City of Boynton Beach and Town of Lantana

Ramp Impact:

I-95 in each direction will have intermittent shoulder closures, daily and nightly, as needed, Sunday through Thursday.

I-95 in each direction will have up to four lanes closed nightly, 8:30 p.m. until 6 a.m. One lane may close at 8:30 p.m., two lanes may close at 10 p.m. until 5:30 a.m., three or more lanes may close at 12 a.m. until 5a .m. all lanes will re-open by 6 a.m.

Ramp Impact:

The I-95 southbound exit ramp to Gateway Boulevard will be closed to traffic nightly as needed, Sunday through Thursday for survey and paving activities. Traffic will be detoured via the I-95 southbound exit ramp to Hypoluxo Road. Motorists can access Gateway Boulevard by traveling eastbound to US-1/Federal Highway or westbound via Congress Avenue then south to Gateway Boulevard. FHP will be onsite to assist motorists.

The I-95 southbound exit ramp to Hypoluxo Road will be closed nightly, as needed, 9:30 p.m. until 5 a.m., Sunday through Thursday for survey and paving activities. Traffic will be detoured via the I-95 southbound exit ramp to Gateway Boulevard. Motorists can then access Hypoluxo Road by traveling eastbound to US-1/Federal Highway or westbound to Congress Avenue and north to Hypoluxo Road. FHP will be onsite to assist motorists.

The I-95 northbound entrance ramp from Gateway Boulevard will be closed to traffic nightly, as needed, 9:30 p.m. until 5 a.m., Sunday through Thursday for survey and paving activities. Motorists traveling westbound on Gateway Boulevard will be detoured via Congress Avenue and the I-95 northbound entrance ramp from Hypoluxo Road. Eastbound Gateway Boulevard traffic will be detoured via US-1/Federal Highway and the I-95 northbound entrance ramp from Hypoluxo Road. FHP will be onsite to assist motorists.

I-95 northbound entrance ramp from Hypoluxo Road will be closed to traffic nightly, as needed, 9:30 p.m. until 5 a.m., Sunday through Thursday for survey and paving activities. Westbound Hypoluxo Road traffic will be detoured via Congress Avenue and the I-95 northbound entrance ramp from Lantana Road. Eastbound Hypoluxo Road traffic will be detoured via Federal Highway/US-1 and the I-95 northbound entrance ramp from Lantana Road. FHP will be onsite to assist motorists.

The I-95 northbound exit ramp to Lantana Road will be closed nightly, as needed, 9:30 p.m. until 5 a.m., Sunday through Thursday for survey and paving activities. Traffic will be detoured via the I-95 northbound exit ramp to Hypoluxo Road. Motorists can then access Lantana Road by traveling eastbound to US-1/Federal Highway or westbound to Congress Avenue and north to Lantana Road. FHP will be onsite to assist motorists.

Please note that ramp closures will be closed as needed per paving production; consecutive ramps will not be closed at the same time.


I-95 Bridge Beam Replacement at 10th Avenue North in the City of Lake Worth Beach

Traffic Impact:

10th Avenue North at I-95 will have one eastbound lane closed nightly, 9 p.m. until 5 a.m., Sunday through Thursday.

To ensure pedestrian and cyclist safety, 10th Avenue North at I-95 will have the eastbound bicycle lane and south sidewalk closed for the duration of the project. Pedestrians will be detoured to the north sidewalk and bicyclists will temporarily share the eastbound general traffic lane for a 150-foot section.


SR 9/I-95 over Donald Ross Road Bridge Painting Project

Restrictions:

All lanes are open. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773 or angel@valerin-group.com.


I-95 Lighting and Roadway Improvements Project from south of State Road 706/Indiantown Road to County Road 708/SE Bridge Road

Restrictions:

The shoulder in both directions of I-95 will be intermittently closed Monday through Friday from 6:30 a.m. to 6 p.m. through Aug. 2021 for temporary asphalt placement, landscaping relocation efforts, and conduit and light pole foundation installations.

One lane in either direction of I-95 at the Indiantown Road interchange may be closed Sunday through Thursday night from 10 p.m. to 6 a.m. to facilitate the construction of a minor traffic diversion. For more information, please contact Community Outreach Specialist Kathleen Dempsey at 772-359-5118 or kdempsey@corradino.com.


Please click on a link below to view lane closures in other areas of Palm Beach County:
I-95 Palm Beach CountyI-95 Palm Beach County Closures Northern Palm Beach CountyNorthern Palm Beach County Closures
Southern Palm Beach CountySouthern Palm Beach County Closures Western Palm Beach CountyWestern Palm Beach County Closures
Central Palm Beach CountyCentral Palm Beach County Closures Bridges Palm Beach CountyPalm Beach County Bridge Closures
Palm Beach County Maintenance ClosuresMaintenance, Utility and Permit Closures  
 
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone