Treasure Coast Header Image

State Road (SR) 710/MLK Jr Boulevard Advanced Transportation Management System (ATMS) Project

Financial Number: 446551-1-52-01

Project Length: 1.658 miles

Project Limits: SR 710/MLK Jr Boulevard from North Congress Avenue to President Barack Obama Highway

Start Date: January 10, 2025

Completion Date: Summer 2025

Contractor: Horsepower Electric, Inc.

Estimated Construction Cost: $1.8 million

Scope of Work:

The project improvements include installing solar-powered traffic signs equipped with modern technology that detects bicyclists and activates flashing signals to warn drivers, improving safety for cyclists; installing Closed-Circuit Television (CCTV) cameras to enhance real-time traffic monitoring and improve motorist safety; upgrading the Advanced Transportation Management System (ATMS) technology to enhance coordination with the Regional Traffic Management Center (RTMC), improving traffic flow and enabling faster incident response; installing new traffic loops to optimize signal changes, enhancing safety and efficiency of the infrastructure.

Documents:

PDF IconSR 710_MLK Jr Blvd ATMS Project_Flyer_.pdf

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

E4X17  MLK JR Blvd at Avenue J  Pre Construction

 

 




Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County

Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone
zero