Financial Number: 451598-1-52-01
Project Length:
Project Limits:
- I-95 Northbound and Southbound Exit Ramps at SR-80/Southern Blvd
- I-95 Northbound Exit Ramp at Congress Avenue / Peninsula Court
- I-95 Northbound Exit Ramp at SR-794/Yamato Road
Purpose of the Project: This project will install a Wrong Way Driving Detection System at four I-95 Interchange exit ramps. The detection systems will flash DO NOT ENTER signs to the driver and alert the Regional Transportation Management Center when a wrong way driver is detected.
Anticipated Start: Fall 2026
Anticipated Completion: Fall 2027
Estimated Construction Cost: $1.5 million
Proposed Improvements:
- Improvements include signing, pavement markings, and Intelligent Transportation System (ITS) elements such as video detectors, highlighted signs, ITS cabinets, underground fiber optic cable, and electrical service wire.
- The locations are proposed in West Palm Beach and Boca Raton.
- A brief video with more information about this FDOT Initiative can be found online at: https://youtu.be/c8BAMdHT6GE.
- More information can also be found at the state Wrong Way Driving website at: https://www.fdot.gov/traffic/teo-divisions.shtm/cav-ml-stamp/Wrong-Way-driving
Construction Impacts:
- Temporary lane closures will occur during off-peak hours.
- Detours are required, one night per ramp, due to ramp closures for testing purposes.
- Pedestrian detours may be required for sidewalk closures.
Documents:
Contact Information:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
- Jeffrey Robbert, P.E. FDOT Project Manager
- Florida Department of Transportation
3400 West Commercial Boulevard
Fort Lauderdale, FL 33309
- Phone: (954) 777-4648
- Email: [email protected]
|