| FPID: 444121-1-52-01	 Limits:  SR 9 / I-95 Southbound off-ramp at Belvedere Road
                    93220158 – MP 0 to MP 0.741; 93503501 – MP 0.214 to MP 0.284  Project Improvements:
 
                      Widen roadway pavement to the outside on I-95 southbound to lengthen the off-ramp deceleration laneInstall speed feedback signs to provide drivers’ traveling speed in comparison to the posted speed limitUpgrade pavement markings and signsProvide a High Friction Surface Treatment on the southbound off-rampReplace/relocate impacted sign structuresImplement Wrong Way Driving Detection System on the southbound off-ramp Construction Impacts:
 
                      Work will be completed in phases to minimize construction impactsSingle lane closures will be required on southbound I-95 mainline for majority of workDouble lane closures will be required during construction of overhead sign structure on I-95 mainline and final resurfacing activitiesRamp closures will occur Sunday through Friday (nightly) from 9 p.m. to 6 a.m. (estimated duration is 20 days). Construction Information:
 
                      Project Letting: February 3, 2023Construction Begins: Late 2023Anticipated Completion: Late 2024Construction Cost Estimate: $1.6 million Public Meeting:
 Contact Information:
 Documents:  444121-1 public workshop presentation
  Comment Form I-95 Belvedere SB Off Ramp Improvement
  Wrong Way Driving System Exhibit
 |