Financial Number: 449159-1-52-01 and 449160-1-52-01

Project Length: 17.002 Miles

Project Limits: State Road (SR) 9/I-95 from north of Bridge Road to south of Kanner Highway and SR 9/I-95 from south of Kanner Highway to Martin/St. Lucie County line

Purpose of the Project: This project aims to enhance resiliency and safety along SR 9/I-95 from north of Bridge Road to the Martin/St. Lucie County line. Key improvements include repaving, restriping, and widening the northbound on-ramp shoulder, along with measures to reduce wet weather crashes, enhance nighttime visibility, and prevent wrong way driving, all in line with FDOT's commitment to creating a resilient and secure transportation network.

A Public Meeting Was Held On: Wednesday, September 25, 2024, at 6:00 p.m. and was offered in-person and virtually simultaneously.

The In-person public meeting took place at the Courtyard by Marriott Stuart located at 7615 SW Lost River Road, Stuart, Florida 34997.

The virtual public meeting was held via GoToWebinar.

The public meeting consisted of a formal presentation followed by an open discussion. Staff was available to answer questions and provide assistance. Comments and questions were answered in the order received. Questions not answered during the event, will receive a response in writing following the meeting. Questions and comments may also be submitted prior to the meeting by contacting the Project Manager.

Click Here to View a Recording of the Public Meeting: https://youtu.be/mghhGex3JxQ

Anticipated Start Date: Spring 2025

Anticipated Completion Date: Winter 2026

Estimated Construction Cost: $48.4 million

Scope of Work:

  • Repave and restripe the existing roadway from north of Bridge Road to the Martin/St. Lucie County line to rehabilitate the pavement.
  • Widen the northbound on-ramp shoulder from SR 76/Kanner Highway to meet current standards.
  • Improve roadway slopes in hydroplaning risk areas to reduce wet weather crashes.
  • Upgrade signing and pavement markings north of Bridge Road to the Martin/St. Lucie County line as required to meet current standards.
  • Conventional lighting will be constructed to help reduce nighttime crashes.
  • Install wrong way detection system on Kanner Highway and Martin Highway ramps to reduce the potential for wrong way crashes.

Construction Impacts:

  • Detours will be required to complete milling and resurfacing of the interchange ramps.
    • Nighttime closures will take place during the weekdays from 8 PM to 6 AM.
  • Work will be done in phases to reduce the effects of construction on the community.

Documents:

PDF Icon449159-1 and 449160-1 - PPT - SR 9_I 95 Projects.pdf

PDF Icon449159-1 and 449160-1 - Flyer - I-95 Projects - Invitation.pdf

Point of Contact:

  • Mr. Robert Lopes P.E. — FDOT Project Manager
  • Address: 3400 West Commercial Boulevard Fort Lauderdale, Florida 33309
  • Phone: 954-777-4425
  • Email: [email protected]
 

 

 

Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County

Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
zero