Financial Number: 447649-1-52-01
Project Length: 1.724 miles
Project Limits: The project limits are on State Road (SR) 5/US 1 from north of Southeast Fischer Street to north of Southeast Decker Avenue in the City of Stuart and unincorporated Martin County.
Virtual Public Meeting: Wednesday, April 9, 2025, from 5:00 p.m. to 6:00 p.m. A brief presentation followed by questions and comments from the public will be held from 5:00 p.m. to 5:30 p.m. and again from 5:30 p.m. to 6:00 p.m. Please use the following link to register:https://bit.ly/4hfTTTm . You may also call +1 (213) 929-4212 Access Code: 942-039-533.
In-Person Construction Open House: Wednesday, April 9, 2025, from 6:00 p.m. to 7:00 p.m. at the Stuart/Martin County Chamber of Commerce, First Floor Conference Room, located at 1650 South Kanner Highway, Stuart, FL 34994.
Start Date: April 2025
Completion Date: Summer 2026
Contractor: Timothy Rose Contracting, Inc.
Construction Cost: $7.5 million
Scope of Work:
The project improvements consist of milling and resurfacing the existing roadway within the project limits to enhance safety and long-term resiliency, widening the bicycle lane by restriping it from 4 feet to 5 feet to increase safety, constructing 25 new light poles with LED fixtures at signalized intersections to boost nighttime visibility, reconstructing existing sidewalk curb ramps throughout the project limits to enhance safety and connectivity for pedestrians, upgrading existing pedestrian signals at signalized intersections to improve push button accessibility, and upgrading signage and pavement markings to enhance safety, functionality, and traffic operations.
Documents: SR 5 Resurfacing Project Flyer FINAL.pdf
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
|