Project Limits: From south of SW Alcantarra Blvd. to south of SW Darwin Blvd.
Start Date: January 27, 2022
Completion Date: Early 2025
Contractor: Zahlene Enterprises, Inc.
Estimated Construction Cost: $11,570,179.20
Scope of Work: Project improvements include widening SW Port St. Lucie Blvd. from a two-lane undivided roadway to a four-lane divided roadway, installing three new signalized intersections with mast arms at SW Alcantarra Blvd., SW Tulip Blvd., and SW Tunis Blvd., adding a right turn lane on SW Port St. Lucie Blvd.’s north approach to SW Alcantarra Blvd., constructing an 18’ wide raised median with curb and gutter, upgrading crosswalks and curb ramps to meet Americans with Disabilities Act (ADA) standards, constructing 8’-10’ wide sidewalks on both sides of SW Port St. Lucie Blvd. for pedestrian and bicycle use, and 6’ wide sidewalks on side streets, installing a new closed drainage system, signing, pavement markings, signalization, and lighting upgrades, and landscaping for the median including trees, irrigation and stamped concrete.
Point of Contact:
"Para información y preguntas en Español, por favor llame al (954) 777-4302."