State Road (SR) A1A North Causeway Over Intracoastal Waterway (ICWW) Bridge Replacement Project
Financial Number: 429936-2-52-01
Project Length: 1.205 miles
Project Limits: From US-1 to Approximately 2,000 Feet East of Existing Bridge
Start Date: May 2023
Completion Date: Late 2027
Contractor: Vecellio & Grogan, Inc.
Estimated Construction Cost: $111.5 million
Scope of Work:
Project improvements include constructing a new high-level fixed bridge connected directly to US-1 over the FEC Railroad, Old Dixie Highway, and the ICWW featuring: one (1) 12-foot travel lane in each direction and navigational clearances of 85-feet vertical and 125-feet horizontal at the waterway channel; installing a barrier protected sidewalk on the south side of the bridge and a barrier protected, buffered shared-use path on the north side of the bridge; building an Observation Deck beneath the west side of the new bridge structure; installing 7-foot buffered bicycle lanes within shoulders on either side of SR A1A; constructing a shared-use path along Old Dixie Highway to provide connectivity to the East Coast Greenway; constructing a new access road under the bridge to businesses east of the FEC Railroad; extending Juanita Avenue from US-1 to Old Dixie Highway; and, connecting US-1 and Old Dixie Highway along Sunny Lane.