Project Limits: State Road (SR) 5/US 1 from Davis Street to the south end of the Sebastian Inlet Bridge (No. 700224) over the St. Sebastian River in the City of Sebastian
In-Person Construction Open House:Tuesday, September 17, 2024, from 6:00 p.m. to 7:00 p.m. at the North Indian River County Library, located at 1001 Sebastian Boulevard, Sebastian, FL 32958. This event is not sponsored by the Indian River County Library System.
Start Date: September 25, 2024
Completion Date: Summer 2025
Contractor: OHLA-USA, Inc.
Estimated Construction Cost: $5.7 million
Scope of Work:
The project improvements consist of milling and resurfacing the existing roadway, reconstructing existing sidewalk curb ramps to meet current Americans with Disability Act (ADA) standards, installing sidewalks at the northern end of the project limits, upgrading lighting to better illuminate pedestrian crosswalks at signalized intersections, installing pedestrian countdown signal features at signalized intersections, and upgrading signage and pavement markings.
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.