Treasure Coast Header Image

SR 9/I-95 at CR 606/Oslo Road New Interchange and CR 606/Oslo Road Widening Project

Financial Number: 413048-2-52-01 and 431521-1-52-01

Project Length: I-95: .5 mile north and south of CR 606/Oslo Road CR 606/Oslo Road: .5 mile west to 58th Avenue SW 82 Avenue: 1 mile north of CR 606/Oslo Road

Project Limits: SR 9/I-95 at CR 606/Oslo Road, CR 606/Oslo Road from east of SR 9/I-95 to SW 58th Avenue, and CR 606/Oslo Road from east of 82nd Avenue to west of 66th Avenue

Virtual Public Meeting:

Start Date: August 14, 2023

Completion Date: Summer 2027

Contractor: Halley Engineering Contractors, Inc.

Estimated Construction Cost: $95.78 million

Scope of Work:

The project improvements consist of constructing a new interchange with partial cloverleaf ramps at SR 9/I-95 and CR 606/Oslo Road, widening CR 606/Oslo Road from a two-lane to a four-lane divided roadway from west of SR 9/I-95 to SW 58th Avenue, installing interchange ramp lighting, replacing the existing CR 606/Oslo Road bridge over SR 9/I-95, installing a new signalized intersection at CR 606/Oslo Road and 66th Avenue SW, installing intersection lighting at 74th Avenue, 66th Avenue and 58th Avenue, realigning 82nd Avenue at CR 606/Oslo Road, eliminating the 86th Avenue connection to CR 606/Oslo Road, constructing 13th Street SW to connect 86th Avenue SW and 90th Avenue, extending the south limit of the noise wall on SR 9/I-95, replacing Indian River County sanitary, water and raw water mains, upgrading signing, signalization, intersection lighting, bicycle lanes, and sidewalks, installing a closed drainage system and constructing three drainage ponds.

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Click here for upcoming lane closures

Documents:

PDF IconI-95 at Oslo Road New Interchange and Oslo Road Widening Project Open House Flyer

 

Project Photos

Pre-Construction

Click to view enlarged version/details
During construction During construction During construction

During Construction

Click to view enlarged version/details
During construction During construction During construction During construction
During construction During construction During construction During construction
Westbound Oslo Road over I 95  end bent 3 test Pile #1, Feb. 2024 Subsoil excavation and backfill  westbound Oslo approaching I 95 looking west, Feb. 2024Installing PPP from S232 to S231 along Westbound Oslo Road, Mar. 2024Installing ITS conduits along new 82nd Avenue Alignment, Mar. 2024

 

 

 

Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County

Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone