FDOT District Four - Broward Header Image

SR 7/US 441 Mobility Improvements – Prospect Road from SR 7/US 441 to SR 870/Commercial Blvd

Financial Number: 429576-4

Project Length: 2.182 miles

Project Limits: Prospect Road from SR 7/US 441 to SR 870/Commercial

Virtual Public Workshop:

Projected Letting: April 2022

Start Date: Summer 2022

Completion Date: Summer 2023

Estimated Construction Cost: $6.5 M

Scope of Work:

  • Reduce travel lanes from 12-ft to 11-ft and widen roadway to provide bicycle lanes.
  • Construct sidewalk where missing along the south side of Prospect Road from SR 7/US 441 to NW 31 Ave and along both sides of roadway from NW 31 Ave to SR 870/Commercial Blvd.
  • Provide drainage improvements as a result of widened pavement.
  • Pedestrian signal modifications at SR 7/US 441, NW 31 Ave, and SR 870/Commercial Blvd.
  • Tree removals and root pruning and a result of widened roadway.

Construction Impacts:

  • Lane closures are planned.
  • Access for emergency responders and driveways will be maintained.
  • Pedestrian detours will be provided where sidewalk closures occur.

Contact Information:

 
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero