Financial Numbers: 447680-1-52-01 and 447680-1-52-02
Project Lengths: 1.03 miles
Project Limits: From SR 820/Pines Boulevard to SR 824/Pembroke Road
Start Date: January 2025
Completion Date: Fall 2025
Contractor: Weekley Asphalt Paving, Inc.
Estimated Construction Cost: $3,165,008
Scope of Work: Project improvements consist of milling and resurfacing the existing roadway within the project limits to ensure long-term infrastructure resilience; constructing a right-turn lane along eastbound SR 824/Pembroke Road to southbound SR 823/Flamingo Road to improve vehicular capacity and mobility; replacing the traffic signal mast arm at the northeast corner of SR 824/Pembroke Road and
SR 823/Flamingo Road to enhance traffic safety and mobility, and improve signal visibility; upgrading existing pedestrian signals at signalized intersections to improve push button accessibility; upgrading concrete sidewalks, curb ramps, pavement markings, and signage to improve visibility and accessibility; and installing new light poles with LED fixtures at the intersections of Washington Street and SR 824/Pembroke Road to improve safety and enhance nighttime visibility.
Documents:
447674-1_Flamingo Road RRR_Project Flyer - January 2025.pdf
Contact Information:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
|