Financial Number: 432066-8-52-01
Project Length: 1.48 Miles
Project Limits: Along University Drive from Riviera Boulevard to State Road (SR) 824/Pembroke Road
Virtual Public Workshop: Monday, May 10, 2021, 6:00 p.m. to 7:00 p.m.
Participants may register at:
https://attendee.gotowebinar.com/register/3879995526839518476
or can join by phone by dialing in to
+1 (213) 493-0005; Access Code: 152-652-841
Start Date: Spring 2022
Construction Date: Fall 2023
Estimated Construction Cost: $9.5M
Scope of Work:
- Accommodate bicycle lanes by resurfacing and widening the existing roadway
- Construct incidental drainage due to the proposed widening
- Construct curb and gutter and sidewalks
- Upgrade curb ramps to comply with current Americans with Disabilities Act (ADA) standards
- Construct bus shelters at existing bus stop locations
- Construct a new pedestrian bridge near the intersection of Miramar Boulevard, over the South Broward Drainage District (SBDD) Canal No. 1
- Upgrade signing and pavement markings
- Upgrade three signalized intersections to pedestrian countdown signals:
- SR 817/University Drive and Miramar Parkway
- SR 817/University Drive and Miramar Boulevard
- SR 817/University Drive and Pembroke Road
- Replace light poles impacted by proposed widening and improve lighting uniformity levels on the sidewalk, including pedestrian lighting retrofit at the signalized intersections of:
- SR 817/University Drive and Riviera Boulevard
- SR 817/University Drive and Miramar Parkway
- SR 817/University Drive and Miramar Boulevard
- SR 817/University Drive and Pembroke Road
Construction Impacts:
- Resurfacing will be performed at night
- Work will be phased to reduce impacts to the community
- Lane closures are anticipated; however, no full roadway closure will be required