Financial Number: 447680-1-52-01
Project Length: 1.1 miles
Project Limits: State Road (SR) 823/Flamingo Road from Pembroke Road to SR 820/Pines Boulevard
Public Meeting: Thursday, August 17, 2023, 6 p.m.
The public meeting will be held both in person and virtually simultaneously on Thursday, August 17, 2023, at 6 p.m. at the Charles F. Dodge City Center located at 601 City Center Way, Room A102, Pembroke Pines, FL 33025.
To participate in the virtually from your computer, tablet or smartphone please register using the following link: https://bit.ly/SR823-FlamingoRd-PM. Participants can also use their phone by dialing +1 (631) 992-3221; Access Code: 407-314-053.
Start Date: Fall 2024
Completion Date: Fall 2025
Estimated Construction Cost: $3.2 million
Scope of Work:
- Repaving the existing roadway
- Adding an eastbound right turn lane at the intersection of SR 823/Flamingo Road and SR 824/Pembroke Road
- Restriping the roadway from 12-foot lanes to 11-foot lanes
- Restriping the bike lanes from 4-feet to 7-feet
Construction Impacts:
- Daytime and nighttime work will be performed within the project limits
- Work will be done in phases to reduce the effects of construction on the community
- Access to properties adjacent to the corridor will be maintained throughout construction