Financial Number: 441771-1-52-01
Project Length: 0.346 miles
Project Limits: SR-838/SUNRISE BOULEVARD AT SR-845/POWERLINE ROAD
A Hybrid Public Meeting Was Held On: Wednesday, November 17, 2021, and was offered in two different formats: virtual and in-person.
The virtual (online) public meeting took place from 5:00 PM to 6:00 PM and consisted of a formal presentation followed by an open discussion. A recording of the presentation can be found below.
The in-person public meeting took place from 6:30 PM to 7:30 PM, following an open house format and was held at the Hampton Inn Fort Lauderdale/Las Olas located at 250 N Andrews Ave, Fort Lauderdale, FL 33301. The latest social distancing guidelines were followed.
A recording of the presentation can be found below.
Click Here: https://youtu.be/u5GnCFDBQS8
Projected Letting: January 2022
Start Date: Summer 2022
Completion Date: Early 2023
Estimated Construction Cost: $1.1 M
Scope of Work:
- Add an additional southbound left turn lane at the intersection
- Extend the southbound bicycle lane from Chateau Park Dr. to Sunrise Blvd.
- Reduce speed limit to 35 MPH between Sunrise Blvd. and NW 13th Street
- Improve signal timing and operations
- Install new signal poles and signing upgrades
Construction Impacts:
- Work will be sequenced to reduce the effects of construction on the community
- Lane closures will occur outside peak traffic hours
- Pedestrian access will be maintained throughout construction
Contact Information: