Financial Number: 435808-5-52-01
Project Length: 0.880 miles
Project Limits: 435808-5-52-01
- Cypress Creek Road from Powerline Road to SFRC
- N Andrews Way from dead end to N Andrews Avenue
- NW 59th Court from Powerline Road to NW 6th Way
Virtual Public Workshop: Thursday, June 17th, 2021, 5:30pm,
Link to registration page:
https://bit.ly/3vhMKuz
Projected Letting: January 2024
Construction Start Date: Spring 2024
Anticipated Completion: TBD
Estimated Construction Cost: $4.8 M
Scope of Work – 435808-5-52-01:
- Resurfacing and minor widening of Cypress Creek Road
- Pedestrian and Bicycle improvements along Cypress Creek Road
- Resurfacing of N Andrews Way
- New sidewalk along both sides of N Andrews Way
- Resurfacing of NW 59th Court and new curb and gutter along both sides
- Shared use path along south side and new sidewalk along north side of NW 59th Court
Construction Impacts:
- Maintain existing number of lanes during peak hours
- Lane closures to perform pavement resurfacing and sidewalk construction
- Detours and proper signage when temporary closures necessary.
- Pedestrian detours will be provided to maintain connectivity
Contact Information:
Documents:
Virtual Public Information Workshop Flyer
|