FDOT District Four - Broward County Header Image

State Road (SR) 811/Dixie Highway from north of SR 834/Sample Road to south of SR 810/Hillsboro Boulevard

Financial Number: 448174-1-52-01

Project Length: 2.95 Miles

Project Limits: State Road (SR) 811/Dixie Highway from north of SR 834/Sample Road to south of SR 810/Hillsboro Boulevard

Project Purpose: The Resurfacing, Restoration and Rehabilitation (RRR) project will extend the service life of the pavement, enhance roadway safety, and improve operating characteristics of the corridor.

A Public Meeting Was Held: The public meeting was offered virtually and in-person.

The virtual public meeting took place on Wednesday, February 8, 2023, at 6:00 p.m. and consisted of a formal presentation followed by an open discussion. The virtual public meeting was recorded and took place via GoToWebinar..

The in-person public meeting followed an open house format and took place on Thursday, February 9, 2023, from 6:00 p.m. to 7:30 p.m. and was held at the DoubleTree by Hilton Deerfield Beach-Boca Raton located at 100 Fairway Drive, Deerfield Beach, Florida 33441. Staff was available to answer questions and provide assistance.

During the virtual public meeting, comments and questions were answered in the order received. If a question was not answered during the event, a response was provided in writing following the meeting. Questions and comments may be submitted by emailing the Project Manager.

Virtual Public Meeting Recording:

Start Date: Spring 2025

Completion Date: Fall 2026

Estimated Construction Cost: $6 million

Scope of Work:

  • Repaving and restriping the existing roadway within the project limits
  • Replacing and upgrading the existing pedestrian curb ramps to comply with Americans with Disabilities Act (ADA) standards
  • Upgrading signing and pavement markings
  • Narrowing lanes to 11-foot to accommodate 6-foot buffered bike lanes
  • Constructing a sidewalk along the east side from north of Sample Road to NE 54 Street
  • Proposing new pedestrian crosswalks including pedestrian signalization and lighting at:
    • North of NE 38 Court
    • North of NE 44 Street
    • North of NE 51 Street
    • South of SW 7 Street
  • Upgrading pedestrian signalization and lighting improvements at the following signalized intersections:
    • Pompano Distribution Center II
    • NE 48 Street
    • NE 54 Street/SW 15th Street
    • SE/SW 10 Street
    • SE/SW 4 Street

Construction Impacts:

  • Work will be done in phases to reduce the effects of construction on the community
  • Temporary lane closures during non-peak hours will occur
  • There will be no complete road closures
  • Access to properties adjacent to the corridor will be maintained throughout construction

Contact Information:

Documents:

PDF IconState Road (SR) 811/Dixie Highway from north of SR 834/Sample Road to south of SR 810/Hillsboro Boulevard Resurfacing, Restoration, and Rehabilitation (RRR) Presentation (2023)

PDF IconState Road (SR) 811/Dixie Highway from north of SR 834/Sample Road to south of SR 810/Hillsboro Boulevard Resurfacing, Restoration, and Rehabilitation (RRR) Presentation

 

Project Photos

Click to view enlarged version/details
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero