State Road (SR) 820/Hollywood Boulevard Resurfacing, Restoration and Rehabilitation from SR 5/US 1 to N Ocean Drive
Financial Number: 447654-1-52-01
Project Length: 1.851 Miles
Project Limits:
SR-820/Hollywood Boulevard from SR-5/US-1 to N Ocean Drive
Hybrid Public Meeting:
Projected Letting: Winter 2024
Start Date: Fall 2024
Completion Date: Fall 2026
Estimated Construction Cost: $4.5 Million
Scope of Work:
Repave and restripe the existing roadway
Add lighting along corridor
Reconstruct pedestrian sidewalk curb ramps
Upgrade pedestrian signalization at 13th Avenue intersection
Add special emphasis crosswalks at signalized intersections
Replace and upgrade signage impacted by construction
Construction Impacts:
Work will be done in phases to reduce the inconvenience to the community.
No nighttime work will be done to avoid construction noise impacts.
Temporary lane closures will be required during daytime hours.
Detours will be required for the milling and resurfacing operations in front of 700 thru 750 Hollywood Blvd. Detours are anticipated to be limited to weekdays and are estimated to last a few days.
Access to residents and businesses will be maintained at all times.