State Road (S.R.) A1A Resurfacing, Restoration and Rehabilitation (RRR) Project
Financial Numbers: 448405-1-52-01
Project Lengths:1.009
Project Limits: Flamingo Avenue to south of Pine Avenue
Virtual Public Meeting:
Start Date: January 2026
Completion Date: Fall 2026
Contractor: Weekly Asphalt Paving, Inc.
Construction Cost: $2,638,158.91
Scope of Work:
Project improvements along S.R. A1A include milling and resurfacing the existing roadway within the project limits to ensure long-term infrastructure resilience, replacing crosswalks at various locations within the project limits, installing in-pavement lighting at the Hibiscus Avenue Crosswalk, upgrading existing pedestrian signals at signalized intersections to enhance pedestrian safety, and upgrading concrete sidewalks, curb ramps, pavement markings, and signage to improve visibility and accessibility.